ENAE 791 - Spring, 2014
|
|
Space Systems Laboratory - Department of Aerospace Engineering - University of Maryland |
140408 - There is no live lecture on Thursday 4/10. Watch this site for Problem Set 3 and the solutions to 1 and 2 - sorry it's taken so long.
140331 - Because I made a stupid mistake yesterday, I loaded an old version of the syllabus on the web site. This should be back to normal.
140330 - Due to an equipment malfunction, the Tuesday 3/27 lecture was not recorded. As announced in class on Tuesday, I was on travel the last half of the week and there was no live lecture on Thursday. We'll get it all straightened out this coming week.
140131 - This is the syllabus for the course, but the order of classes (shown here from 2012) is definitely going to change. I'll be adding in problem set handout and due dates, midterm details, final presentations, etc., but I wanted to get this up fast to let you download the slides for the first two lectures. More to come...
|
|
|
Jan. 28 (#01) | Course
Overview; Review of Orbital Mechanics [PDF: 2.2 Mb, 54 pgs] |
|
Jan. 30 (#02) | Orbital Mechanics/Rocket Performance [PDF: 2.2 Mb, 31 pgs] |
|
Feb. 4 (#03) | Rocket Performance [PDF: 2.6 Mb, 55 pgs] |
|
Feb. 6 (#04) | Ballistic Entry [PDF: 5.7 Mb; 40 pgs.] |
|
Feb. 11 (#05) | Ballistic and Lifting Entry [PDF: 6.3 Mb; 52 pgs.] |
|
Feb. 18 (#06) | Lifting Entry [PDF: 3.9 Mb; 32 pgs.] |
|
Feb. 20 (#07) | Entry Aerodynamics [PDF: 2.7 Mb; 30 pgs.] |
|
Feb. 25 (#08) | Entry, Descent, and Landing: 2.5 Case Studies [PDF: 2.5 Mb; 39 pgs.] |
|
Feb. 27 (#09) | Entry, Descent, and Landing: Mars Science Laboratory [PDF: 23.5 Mb; 51 pgs.] |
|
March 4 (#10) | Entry, Descent, and Landing: ParaShield [PDF: 5.3 Mb; 69 pgs.] |
|
March 6 (#11) | Cost Estimation and Engineering Economics |
|
March 11 (#12) | Redundancy, Reliability, and Resiliency [PDF: 2.2 Mb; 44 pgs.] |
|
March 13 (#13) | Real-World Entry Applications [PDF: 3.1 Mb; 27 pgs.] |
|
March 18 | Spring Break | |
March 20 | Spring Break | |
March 25 (#14) | Rocket Propulsion [PDF: 6.7 Mb; 52 pgs.] |
|
April 1 (#15) |
Mass Estimating Relations [PDF: 2.8 Mb; 41 pgs.] |
|
April 3 (#16) | Completion of Mass Estimating Relations |
|
April 8 (#17) | Launch Vehicle Systems [PDF: 2.9 Mb; 41 pgs.] |
|
April 15 (#18) | Launch Vehicle Options [PDF: 9.9 Mb; 91 pgs.] |
|
April 17 (#19) | Launch Facilities and Operations [PDF: 6.3 Mb; 96 pgs.] |
|
April 22 (#20) | Entry Heating [PDF: 1.5 Mb; 16 pgs.] |
|
April 24 (#21) | Vehicle Failures [PDF: 2.6 Mb; 28 pgs.] |
|
April 29 (#22) | Launch Vehicle Payload Accommodations [PDF: 2.9 Mb; 57 pgs.] |
|
May 1 (#23) | Launch Vehicle Reusability [PDF: 3.2 Mb; 53 pgs.] |
|
May 6 (#24) | TBD |
|
May 8 (#25) | TBD |
|
May 13 (#26) | TBD |